This tower is finished and has been up for 8 days so far operating on a battery and 125watt Solar Panel.
The tower currently uses a senao bridge for the uplink and a NET4521 with two 200mw Senao PCMCIA cards. Longest up time I have had was 7 days with only the battery which was partly drained to start with. I am using 14dbi HPOL Sectors that cover the whole valley.